|
|
Wish List
Building Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| Generators |
2 |
1. |
$1000.00 |
| Concrete Floor in Building 2 |
1 |
2. |
$10,000.00 |
| Drying Racks for Equipment |
4 |
2. |
$150.00 |
| Storage Racks for Cylinders |
2 |
2. |
$815.00 |
| Asphalt Driveway |
2 |
3. |
|
| Tile Floor in Building 1 |
1 |
3. |
$300.00 |
| Floodlight for Building 2 |
1 |
3. |
$80.00 |
| Heated High Pressure Washer |
1 |
3. |
$3000.00 |
| Large Wash Tubs |
2 |
3. |
$150.00 |
| Personnel Lockers |
20 |
3. |
$430.00 |
| Shutter Doors for Closet of Building 1 |
2 |
4. |
$75.00 |
| Finish Shower Area for Divers |
1 |
4. |
$3300.00 |
| Doors for Building 1 |
4 |
4. |
$70.00 |
| Moulding for Building 1 |
250 |
4. |
$.80 |
| Exit Lights |
3 |
5. |
$245.00 |
| Insulate Building 2 |
1 |
6. |
$1500.00 |
| Finish Ceiling of Building 2 |
1 |
6. |
$5050.00 |
| Finish Walls of Building 2 |
1 |
6. |
$8585.00 |
| Mezzanine Level for Building 2 |
1 |
6. |
$2600.00 |
| Repaint Building 1 |
1 |
8. |
$350.00 |
| Known Total for this Area |
$49,260.00 |
|
| |
Boat Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| Life Jackets |
10 |
2. |
|
| Repaint BURT II |
1 |
3. |
|
| Small Breathing Air Compressor |
1 |
|
|
| Known Total for this Area |
|
|
| |
Diving Equipment Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| Viking Dry Suit Infaltor Hoses |
8 |
1. |
|
| Large Gates Drysuit |
1 |
1. |
|
| Medium Gates Drysuit |
1 |
1. |
|
| Extra Large Gates Drysuit |
1 |
1. |
|
| Commercial Style Weight Belts |
4 |
1. |
|
| Neck Dam assemblies for Superlite 17k |
4 |
1. |
|
| 1st Stage regulator for Bailout Bottle |
3 |
2. |
|
| Large Viking Drysuit |
1 |
2. |
|
| Medium Viking Drysuit |
1 |
2. |
|
| Extra Large Viking Drysuit |
1 |
2. |
|
| Hard Mounting Plates with Wings |
8 |
2. |
|
| Cold Water Regulators with Computers |
8 |
2. |
|
| Sets of Masks, Fins and Snorkels |
8 |
2. |
|
| Cold Water Wetsuits |
8 |
2. |
|
| Shell Style Drysuits |
8 |
3. |
|
| Tape recorders to Hook up to Comm panels |
2 |
4. |
|
| Diver Communications Panel for 2 Divers |
1 |
6. |
|
| Known Total for this Area |
|
|
| |
Training Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| VCR |
2 |
2. |
$125.00 |
| CPR Mannequins |
6 |
4. |
$125.00 |
| Pool for Training Purposes |
1 |
6. |
|
| Known Total for this Area |
$1,000.00 |
|
| |
Communication Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| Fire Station Style Paging System |
1 |
2. |
|
| Base Station Radio |
1 |
6. |
|
| Known Total for this Area |
|
|
| |
Vehicle Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| Trickle Chargers for Vehicles and Boats |
6 |
2. |
$35.00 |
| New Rescue Response Vehicle |
1 |
3. |
|
| Hand Held GPS |
4 |
3. |
$450.00 |
| Lightbars for Vehicles |
4 |
3. |
$700.00 |
| Laser Rangefinders |
2 |
4. |
|
| All Terrain Vehicle for Transporting Equipment |
1 |
5. |
|
| Trailer for Above |
1 |
5. |
|
| Known Total for this Area |
$4,810.00 |
|
| |
Day to day Operating Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| Insurance |
1 |
1. |
$8,000.00/year |
| Cellular Service |
10 |
3. |
$500.00/year |
| Internet Service |
1 |
6. |
$360.00/year |
| Total for this Area |
$15,560/year |
|
| |
Misc Needs
| Item |
Quantity |
Priority (1. thru 10.) |
Appx. Cost/EA |
| Oxygen Kits |
3 |
1. |
$800.00 |
| A.E.D. Units |
2 |
1. |
$1600.00 |
| Trauma Bags |
3 |
1. |
$250.00 |
| Laptops for Scene Detailing |
2 |
2. |
$1800.00 |
| PC Workstation for Building |
1 |
4. |
$800.00 |
| Server for Record Storage |
1 |
5. |
$1000.00 |
| Total for this Area |
$11,750.00 |
|
| |
Items above are listed in priority by category
- = Desperately needed
- = Urgently needed
- = Defiantly needed
- = Wanted and will be needed soon
- = Wanted but not needed yet
- thru 10. = Wanted
|